BP4.2

Take advantage of any physical knowledge when choosing control law architectures in order to simplify the design and gain scheduling. Avoid over complex architecture, and keep the design as possible. Avoid unnecessary duplication of functional elements

Sources

  • RTO-TR-029

Backlinks

[[Control Law Design Best Practices]]
Gain Scheduling