The gain schedule is stable if the region of attraction associated with each linearization is larger than the scheduled operating region for each operating point.
Sources
- “Chapter 5.1.3 – Gain Scheduling | GlobalSpec.” Accessed: May 21, 2023. [Online]. Available: https://www.globalspec.com/reference/21382/160210/chapter-5-1-3-gain-scheduling